1 Skripnikov V.A.
2 Skripnikova M.A.
Year: 
№: 
858
Pages: 
4-7

SGGA

1, 
2, 
Abstract:
Were given proposals for an upgrading of the planned networks on the territory of the hydroelectric power station. The increase of the accuracy of network reference points regarding the base points determination achieved by the lengths line measurement by the satellite geodetic receivers. The cluster method bookmarks is suggested to improve the accuracy of measurement of line length. The results of experimental measurement are presented.
Citation:
Skripnikov V.A., 
Skripnikova M.A., 
(2012) On modernization of planned network for hydroelectric dams deformation determination. Geodesy and cartography = Geodezia i Kartografia, 73(1), pp. 4-7. (In Russian).
Publication History
Published: 20.02.2012

Content