UDC: 
DOI: 
10.22389/0016-7126-2026-1035-9-20-27
1 Kanashin N.V.
Year: 
№: 
1035
Pages: 
20-27

Petersburg State Transport University

1, 
Abstract:
Geodetic support for construction and operation of high-speed railway lines is associated with the need for high-precision geodetic work at all the stages of the life cycle of such structures. Arrangement of a setting-out network requires special responsibility, calculating the accuracy of determining its points' heights is the subject of the article. The insufficiency and imperfection of the results of previously performed research on the topic is shown. It is proposed to carry out computations based on the design parameters of high-speed railway lines. The required density of benchmarks for establishing a set-out network was calculated. The demands set forth in the regulatory documents of various countries operating high-speed railway lines are outlined. The validity of the obtained result and the feasibility of achieving it with existing geodetic measurement methods are demonstrated. Potential directions for future research regarding geodetic support for high-speed railway construction are identified
References: 
1.   Akkerman G. L., Akkerman S. G., Zamukhovskii A. V., Kopylenko V. A. K voprosu o dopustimosti sovmeshcheniya krivykh v vertikal'noi ploskosti s perekhodnymi krivymi v plane pri proektirovanii VSM. Transport Rossiiskoi Federatsii, 2018, no. 1, pp. 22–25.
2.   Astapovich A.V., Sazonov P.A., Sokolov S.M., Pavlov S.V., Shteyn S.V. (2015) Innovative approach to the construction of geodetic networks of linear features large extent. Geodezia i Kartografia, (10), pp. 2-7. (In Russian). DOI: 10.22389/0016-7126-2015-904-10-2-7.
3.   Bol'shakov V. D. Teoriya oshibok nablyudenii s osnovami teorii veroyatnostei. Moskva: Nedra, 1965, 184 p.
4.   Kanashin N. V. O tochnosti razbivochnoi seti dlya stroitel'stva vysokoskorostnoi zheleznodorozhnoi magistrali. Vestnik SSUGT, 2023, Vol. 28, no. 1, pp. 14–21. DOI: 10.33764/2411-1759-2023-28-1-14-21.
5.   Kougiya V.A., Bogomolova E.S., Vereshchagin S.G., Gruzinov V.V., Malkovskii O.N., Poletaev V.I., Sukhanov V.V. (1997) Geodetic network for the high-speed railway line. Geodezia i Kartografia, 58(1), pp. 12-16.
6.   Kougiya V. A., Matveev S. I., Matveev A. S., Manoylo D. S., Balo R. A. Tochnost' geodezicheskikh setei na zheleznodorozhnom transporte. Put i putevoe khozyaistvo, 2012, no. 7, pp. 19–20.
7.   Nikonov A. V., Soboleva E. L., Ryabova N. M., Medvedskaya T. M. Opredelenie srednei kvadraticheskoi oshibki izmereniya prevysheniya na stantsii tsifrovym nivelirom. Interekspo GEO-Sibir', 2015, Vol. 1, pp. 77–84.
8.   Nikonov A. V., Ryabova N. M., Soboleva E. L. Ob oshibke izmereniya prevysheniya na stantsii tsifrovym nivelirom v polevykh usloviyakh. Interekspo GEO- Sibir', 2016, Vol. 1, pp. 37–41.
9.   Stolbov Yu. V., Stolbova S. Yu., Pronina L. A., Starovoitov I. E. Obespechenie tochnosti prolozheniya nivelirnykh khodov pri izyskanii i vynosa vysotnykh otmetok piketov pri stroitel'stve avtomobil'nykh dorog. Vestnik SibADI, 2016, no. 2 (48), pp. 120–125.
Citation:
Kanashin N.V., 
(2026) On the accuracy of the leveling network for constructing a high-speed railway. Geodesy and cartography = Geodeziya i Kartografiya, 87(9), pp. 20-27. (In Russian). DOI: 10.22389/0016-7126-2026-1035-9-20-27
Publication History
Received: 17.02.2025
Accepted: 18.09.2026
Published: 25.10.2026

Content

2026 September DOI:
10.22389/0016-7126-2026-1035-9